An Italian company specializing in the design, production, and maintenance of Organic Rankine Cycle (ORC) systems
THE CHALLENGE
Standardize plant layouts and electrical design for special machinery, improving efficiency in producing technical documentation (network diagrams, cable lists, wiring plans) to accelerate both design and installation processes.
THE SOLUTION
To address the challenges, the team implemented:
- Standardized modular wiring to simplify assembly and reduce variability.
- Automated documentation generation using a centralized database.
- Reusable component libraries for faster design iterations.
- Optimized cable routing with integrated 3D model guidance for installation planning.
RESULTS
- Reduced Electrical Design Time
Development time for electrical schematics decreased by approximately 20%, independent of the plant type. - Improved Installation Efficiency
Advanced 3D cable routing planning streamlined on-site assembly. - Faster Field Operations and Enhanced Traceability
Connection mapping and documentation improvements facilitated maintenance and increased overall system reliability.
