THE CHALLENGE
Adapt the ventilation system of a nearly-complete aseptic isolator from flexible to rigid ducts, ensuring that the available space is fully respected without compromising system functionality or delivery timelines.
THE SOLUTION
The project involved a complete redesign of the duct connections to integrate rigid piping, carefully adapting to the existing spatial constraints without impacting the building envelope. In just 10 days, the 3D model, technical drawings, and component coding were updated, meeting the client’s deadlines.
RESULTS
- Fast and Precise System Adaptation
The redesign eliminated the need for costly structural modifications or alternative communication systems, generating significant savings. - Smooth Testing and Commissioning
No issues or interferences were observed during system testing, confirming quality and reliability. - Client Satisfaction
The client completed installation and commissioning without delays, validating the effectiveness of the implemented solutions.